dub

return to

community projects

Edmonton Urban Design Review Panel / 2000 Award of Excellence

 

Edmonton Urban Design Review Panel / 1994 Award of Excellence for Outstanding Contribution to Urban Design

 

American Concrete Institute (Alberta Chapter) / 1993 Award for Excellence for Design and Construction

 

Canadian Institute of Steel Construction / 1993 Award for Most Effective Use of Structural Steel

Edmonton

City Hall

The Edmonton City Hall was completed in 1992 and consists of 150,000 sq.ft. above grade and 100,000 sq.ft. below.  It includes a council chamber, offices for the mayor and councillors, committee rooms and several key city departments.  Parking and connections to the light rail transit are located below grade.  The entire building is centred around a large City Room and Council Chamber which are naturally lit by glass pyramid enclosures.

 

The City Room has proved to be highly successful. Care was taken with the design details of this Indoor Living Room; for example, the laser-cut perforations in the maple walls allow the insulation behind to absorb sound and improve the acoustics of the space.

The inventive use of multi-levels provides a variety of performance and viewing situations.  It now accommodates events daily and has successfully hosted as many as 3,000 people.

 

The outdoor plaza has similar flexibility.  It readily converts from a wading pool with fountains in the summer, to a skating rink in the winter. It also serves as an outdoor restaurant and a public plaza for special events.  The formal entry on the North of the City Hall receives vehicular movement.

awards

Copyright © 2013 Dub Architects Ltd.

All rights reserved. Designed by

Vanguard Works

dub

architects

ltd.

#401

10229-105 Street

Edmonton

Alberta  T5J 1E3

Canada

Phone +1 780 428 7888

Fax +1 780 425 2212

 

office@dubarchitects.ca